3000 psi concrete fill by others 14 ga.
Concrete steel pan stair details.
The information and details provided here are designed to meet the 2015 international building code ibc.
Baluster spacing clear 4 max.
A 4 1 sec.
Landing length width equal to stairwidth.
Clearance above nosing 6 6 min.
We are a nationwide manufacturer of standard and custom components for commercial stair systems including metal stairpans perforated metal stairpans stair treads landing pans carrier angles and more.
These stairs are intended for use in conjunction with our concrete filled landings.
The pans are built to be filled with concrete after they are installed thus creating an attractive and long wearing surface.
Adding the pans or grating treads.
Concrete frame pan stair.
Pacific stair corporation s 100 series concrete filled stair system is our most affordable standard stair system.
With decades of experience manufacturing steel stairpans for the commercial building industry you can trust that eberl stairpans are manufactured out of highest quality sheet and plate steel and are formed with the tightest of tolerances improving.
Landing railing 36 to 42 above landing.
Stairpans are used in commercial steel stair construction to hold poured concrete for safe and durable walkways that provide strong support.
If a pan stair is being detailed only the top bottom and one typical intermediate pan are required to draw the nosing line.
To the supporting steel.
B 4 2 typical landing plan view landing width landing length varies varies varies min.
After the completion of the.
To view these documents click the link it will open in a new window requires adobe acrobat reader to save these files from the new window.
Draw in the gratings or pans along the nosing line at the calculated positions.
Lapeyre stair 5 20 2014 per specs metal pan landing bp vb typical concrete filled metal pan landing plan view e70xxelect x q r4 0 direction of egress sec.
Not shown diamond plate decking.